Active warehouse operations could not be interrupted. Phased installation required careful coordination with facility management. Existing insulation was water-damaged and required full replacement.
Phased installation approach with GenFlex 60-mil fully adhered TPO membrane, new tapered polyiso insulation for improved drainage, and custom-fabricated metal edge details. Work completed in sections to maintain operations.
Zero operational downtime during installation. New 20-year NDL warranty. Energy costs reduced by an estimated 18% due to improved insulation and reflective TPO membrane.